References

 

 

  • Study Feasibility:

More than 70 studies have already been carried out:roof integration on buildings, simplified roof installation,floor generator, PV membrane, ...

  • Electrical design of generator:

More than 20 studies carried out: roof integration on buildings, simplified roof and PV membrane ...

  • Assistance with project management (OMA):

19 missions AMO made on building-integrated power from 36 to 250 kVA

1 mission AMO made a ground station 4 MWp.